Project profile

Meridian Data Campus

A critical power architecture concept coordinating utility supply, UPS, standby generation and monitoring.

Category

Data Center Power

Location

Rotterdam, Netherlands

Capacity / Scope

24 MW critical load

Year / Status

Concept study · 2026

01

Overview

Meridian Data Campus is a representative concept study showing how Enerovix plans critical power as one coordinated system. A critical power architecture concept coordinating utility supply, UPS, standby generation and monitoring. This profile is illustrative and does not describe completed work.

02

The challenge

Meridian needed a power architecture that could grow from 8 MW to 24 MW of IT load across three phases while maintaining concurrent maintainability and a clear upgrade path for battery storage.

03

The approach

Enerovix proposed a distributed redundant topology with block UPS systems, standby generation per data hall and a medium-voltage ring. Monitoring was designed from day one so every breaker, UPS and generator reports into a single operational view.

04

Technical highlights

  • Three-phase growth path from 8 MW to 24 MW IT load

  • Distributed redundant UPS with lithium-ion autonomy

  • MV ring with automatic transfer between utility feeds

  • Integrated power monitoring across all critical paths

Next step

Have a project with a similar challenge?

Share your site, capacity and timeline. We’ll help define the right engineering next step.

Next step

Have a project with a similar challenge?

Share your site, capacity and timeline. We’ll help define the right engineering next step.

Create a free website with Framer, the website builder loved by startups, designers and agencies.