Project profile

Eastgate Grid Upgrade

A network reinforcement concept focused on connection capacity, protection coordination and future demand.

Category

Grid Infrastructure

Location

United Kingdom

Capacity / Scope

132 kV connection

Year / Status

Concept study · 2026

01

Overview

Eastgate Grid Upgrade is a representative concept study showing how Enerovix plans grid infrastructure as one coordinated system. A network reinforcement concept focused on connection capacity, protection coordination and future demand. This profile is illustrative and does not describe completed work.

02

The challenge

A regional industrial estate expects demand to more than double within ten years. The existing 33 kV supply is near its firm capacity, and any new connection must be delivered alongside live operations.

03

The approach

The concept introduces a new 132/33 kV substation with two transformers, double-busbar switchgear and a staged cut-over plan. Protection and SCADA interfaces were coordinated early with the distribution network operator to reduce late design changes.

04

Technical highlights

  • New 132/33 kV substation with N-1 transformer arrangement

  • Staged cut-over to maintain supply to existing customers

  • Unit and distance protection coordinated with the DNO

  • Space reserved for a third transformer bay

Next step

Have a project with a similar challenge?

Share your site, capacity and timeline. We’ll help define the right engineering next step.

Next step

Have a project with a similar challenge?

Share your site, capacity and timeline. We’ll help define the right engineering next step.

Create a free website with Framer, the website builder loved by startups, designers and agencies.